CAPACITY | PROJECT DESCRIPTION | JOB DESCRIPTION | YEAR | CUSTOMER | CITY/ COUNTRY |
---|---|---|---|---|---|
3 X 144 MW SCPP | 3 X GT Exhaust By pass Stack behind Mitsubishi M701D | Engineering-Manufacturing / 25 m height/ Di =6,100mm | 2020 | Ronesans HI | Turkmenistan |
6 X 10 MW SCPP-Diesel Engine | 6 X 10 MW SCPP-Diesel Engine-MAN | Engineering-Manufacturing / 30 m height/ Di =1,600mm | 2019 | Iltekno | Gine |
3 X 26 MW CCPP | 3 X GT Exhaust By pass Stack behind GE-Frame 5 | Engineering-Manufacturing / 30 m height/ Di =2,400mm + Diverter | 2016 | Sadelmi-Qapco | Doha-Qatar |
2 X 70 MW CCPP | 2 X GT Exhaust By pass Stack behind GE-Frame 7 FA | Engineering-Manufacturing and Erection / 25 m height/ Di =4,200mm | 2015 | EVER-Taha | Mardin-Turkey |
3 X 250 MW SCPP | 3 X GT Exhaust By pass Stack behind GE-Frame 9FA | Engineering-Manufacturing and Erection / 35 m height/ Di =7,000mm | 2015 | Gama | Boufarik-Algeria |
1X 285 MW SCPP | 1 X GT Exhaust By pass Stack behind Siemens SGT 5-4000F | Engineering-Manufacturing / 35 m height/ Di =6,800mm | 2013 | MiTEK | Basra-Iraq |
1 X 60 MW CCPP | 1 X GT Exhaust By pass Stack behind GE-LM6000 | Engineering-Manufacturing and Erection / 24 m height/ Di =3,400mm + Diverter | 2012 | BiSEN | Bursa-Turkey |
2 X 42 MW SCPP | 2 X GT Exhaust By pass Stack behind GE-Frame6 B | Engineering-Manufacturing and Erection / 40 m height/ Di =3,500mm | 2011 | Gama-Tekfen | Atyrau-Kazakistan |
2 X 45 MW CCPP | 2 X GT Exhaust By pass Stack behindGE-LM6000 | Engineering-Manufacturing / 25 m height/ Di =3,400mm + Diverter | 2010 | IEG | Botswana |
1 X 60 MW CCPP | 1 X GT Exhaust By pass Stack behindGE-LM6000 | Engineering-Manufacturing / 30 m height/ Di =3,000mm + Diverter | 2010 | IEG | Povaska- Slovakia |
1 X 60 MWCCPP | 1 X GT Exhaust By pass Stack behind Siemens SGT 800 | Engineering-Manufactuing / 21 m height/ Di =3,600mm + Diverter | 2009 | Raumag | Brauschwieg-Germany |
2 X 285 MW SCPP | 2 X GT Exhaust By pass Stack behind Siemens SGT 5-4000F | Engineering-Manufacturing / 40 m height/ Di =7,000mm | 2009 | ENKA | Zwitina-Libya |
2 X 127 MW SCPP | 2 X GT Exhaust By pass Stack behind GE- Frame 9 E | Engineering-Manufacturing and Erection / 25 m height/ Di =6,500mm | 2009 | LOTUS | Awaza-Turkmenistan |
2 X 127 MW SCPP | 2 X GT Exhaust By pass Stack behind GE- Frame 9 E | Engineering-Manufacturing and Erection / 25 m height/ Di =6,500mm | 2009 | LOTUS | Ahal-Turkmenistan |
1 X 60 MW CCPP | 1 X GT Exhaust By pass Stack behindGE-LM6000 | Engineering-Manufacturing / 40 m height/ Di =3,000mm + Diverter | 2009 | IEG | Dante-Slovakia |
1 X 50 MW CCPP | 1 X GT Exhaust By pass Stack behind GE-LM6000 | Engineering-Manufacturing / 30 m height/ Di =3,000mm + Diverter | 2008 | Nooter Eriksen | Hereke-Tukey |
1 X 60 MW CCPP | 1 X GT Exhaust By pass Stack behind GE-LM6000 | Engineering-Manufacturing / 25 m height/ Di =3,200mm + Diverter | 2008 | ZORLU | Luleburgaz-Turkey |
4 X 50 MW CCPP | 4 X GT Exhaust By pass Stack behind GE-LM6000 | Engineering-Manufacturing / 30 m height/ Di =3,000mm + Diverter | 2007 | IEG | Karachi-Pakistan |
2 X 150 MW SCPP | 2 X GT Exhaust By pass Stack behind Siemens V94.2 | Engineering-Manufacturing / 35 m height/ Di =6,000mm | 2006 | OJSC Power Machines | Kerkuk-Iraq |
3 X HRSG Main Stack | 3 X HRSG Main Stack | Engineering-Manufacturing | 2005 | SASA | Adana-Turkey |
4X 60 MW CCPP | 4 X GT Exhaust By pass Stack behind GE-LM6000 | Engineering-Manufacturing and Erection / 24 m height/ Di =3,400mm + Diverter | 2005 | BiSEN | Bursa-Turkey |
3X 50 MW CCPP | 3 X GT Exhaust By pass Stack behind GE-LM6000 | Engineering-Manufacturing and Erection / 30 m height/ Di =3,000mm + Diverter | 2004 | ZORLU | Kayseri-TURKEY |
1 X 60 MW CCPP | 1 X GT Exhaust By pass Stack behind GE-LM6000 | Engineering-Manufacturing and Erection / 30 m height/ Di =3,000mm + Diverter | 2004 | BiSEN | Bursa-Turkey |
1 x 35 MW CCPP | 1 X GT Exhaust By pass Stack behind GE-LM2500 | Engineering-Manufacturing and Erection / 25 m height/ Di =2,750mm + Diverter | 2003 | ENTEK | iZMiT- TURKEY |
1 x 35 MW CCPP | 1 X GT Exhaust By pass Stack behind GE-LM2500 | Engineering-Manufacturing and Erection / 25 m height/ Di =2,750mm + Diverter | 2003 | ENTEK | BURSA- TURKEY |
1 x 35 MW CCPP | 1 X GT Exhaust By pass Stack behind GE-LM2500 | Engineering-Manufacturing and Erection / 25 m height/ Di =2,750mm + Diverter | 2003 | AYEN | Ankara- TURKEY |
1 X 60 MW CCPP | 1 X GT Exhaust By pass Stack behind GE-Frame 6B | Engineering-Manufacturing 30 m height/ Di =3,750mm + Diverter | 2003 | TUPRAS | iZMiT- TURKEY |
PLANT CAPACITY | PROJECT DESCRIPTION | JOB DESCRIPTION | YEAR | CUSTOMER | CITY/COUNTRY |
---|---|---|---|---|---|
Owner's Engineering | Gemlik Gubre New Urea and UAN(Urea Ammonium Nitrate solution )Project | 2020-On Going | Gemlik Gubre | TURKEY | |
360MW | Technical Due Diligence | 253 MW Çolakoğlu Metalurji Dilovası CCPP | 2021 | Çolakoglu Metalurji |
KOCAELİ |
240MW | Engineering | Cengiz Enerji CCPP Project | 2020 | Cengiz Enerji | UZBEKISTAN |
630MW | Owner's Engineering | Yatagan Coal Fired Power Plant Rehabilitation and Upgrading Project | 2019-On Going | Yatagan Termik | TURKEY |
120MW | Owner's Engineering | Owner's Engineering services for Upgrading of existing 120 MW CCPP | 2019 | Entek | TURKEY |
660MW | Owner's Engineering | Kemerkoy Coal Fired Power Plant Rehabilitation and Upgrading Project | 2017 | YK Enerji | TURKEY |
440MW | Owner's Engineering | Yenikoy Coal Fired Power Plant Rehabilitation and Upgrading Project | 2017 | YK Enerji | TURKEY |
704MW | Basic and Detailed Engineering | 2 x 5.600m3 Fire Water Site Storage Tanks | 2015 | Gama Power Systems | ALGERIA |
704MW | Basic and Detailed Engineering | 2 x 2.500m3 Service Water Site Storage Tanks | 2015 | Gama Power Systems | ALGERIA |
704MW | Basic and Detailed Engineering | 2 x 11.000m3 Demin Water Site Storage Tanks | 2015 | Gama Power Systems | ALGERIA |
704129 | Basic and Detailed Engineering | 2 x 14.500m3 Fuel Oil Site Storage Tanks | 2015 | Gama Power Systems | ALGERIA |
2x660MW | Proposal Engineering | 2x660MW CFPP DeSoX addition proposal engineering for detail design and preparation of BOQs for mechanical, elektrical-I&C and civil works | 2015 | Gama Industry | TURKEY |
3x26MW | Engineering | Exhaust Gas System for 3 x GE MS5001P Gas Turbines including diffuser, diverter, silencer, expansion joints, stack and stuructural Steel | 2015 | Sadelmi | QATAR |
2x70MW | Engineering | Exhaust Gas System for 2 x GE PG6101FA Gas Turbines including diffuser, diverter, silencer, expansion joints, stack and stuructural Steel | 2015 | Ever Industry | TURKEY |
92,50MW | Owner's Engineering | Geothermal Power Plant. 1x47500kW Double Flash - 2x22500kW Binary Cycle | 2014 | GURİŞ | TURKEY |
146,7MW, 141,7MW, 149,2MW | Basic and Detailed Engineering | 3x600m3 Demineralised Water Tanks | 2014 | TURKMENISTAN | |
600MW | Engineering | Equipment Loads & Civil Foundation Calculations | 2013 | ENERJiSA | TURKEY |
2x135MW | Engineering | Coal Fired Power Plant Stack Engineering with ducts | 2013 | AKSA | TURKEY |
2x150MW | Due Dilligence | Coal Fired Power Plant | 2013 | ENERJiSA | TURKEY |
2000MW | Technical Due Diligence | Technical Due Diligence of the whole Energy Portfolio (over 2000 mw including combined cycle power plants, coal fired power plants and hydro power plants) of Turkey's biggest Energy Production company for EON with Lahmayer International. | 2013 | ENERJiSA | TURKEY |
600MW | Pre-Feasibility Study | Conceptual Design and Pre-Feasibility Study of 600MW CCPP | 2012 | ENERJiSA | TURKEY |
450MW | Pre-Feasibility Study | Conceptual Design and Pre-Feasibility Study of 450MW CCPP | 2012 | ERMET | TURKEY |
500MW | Pre-Feasibility Study | Conceptual Design and Pre-Feasibility Study of 500MW CCPP | 2012 | LiMAK | TURKEY |
670MW | Due Dilligence | Due Dilligence of 670MW CCPP | 2012 | ENERJiSA | TURKEY |
820 MW | HRSG Commissioing | 2 X Benson HRSG behind 2 X SGT5- 4000F GT Commissioing works | 2012 | PROKON | TURKEY |
779MW | Gas Turbine Inlet Air Cooling | Structural Design of Chiller Building, Supporting Structural design review of Cooling Coils | 2012 | BAYMiNA | TURKEY |
440MW | Owner's Engineering | Preparation of EPC Tenders for 440MW CCPP | 2010 | GURi§ | TURKEY |
Engineering | 3 X Industrial Boilers | 2005 | SASA | TURKEY | |
75MW | Consulting | Pressure Parts Manufacturing | 2005 | TURKEY | |
75MW | Engineering & Consulting | Consulting for HRSG Rehabilitation, Modification and Upgrading | 2004 | GAMA | TURKEY |
35 MW | Engineering & Consulting | Heat Recovery Steam Generator/ Exhaust Gas System/ Water Steam External piping: LM2500 Gas Turbine | 2003 | GAMA | TURKEY |
25 MW | Engineering | Exhaust Gas System for GE LM2500 Gas Turbine | 2003 | GAMA | TURKEY |
75 MW | Consulting | Technical Evaluation of bids for retrofit work | 2003 | TUPRAŞ | TURKEY |
60MW | Consulting | Heat Recovery Steam Generator for 1xGE FRAME 6B Gas Turbine | 2003 | TUPRAŞ | TURKEY |
150 MW | Engineering | Combined cycle Power Plant Consisting of 13 XWartsila Diesel Engines, 4 X Heat Recovery Steam Generator and 1 X Steam Turbine generator | 2002 | GAMA | TURKEY |
POWER PLANT CAPACITY | PROJECT DESCRIPTION | JOB DESCRIPTION | YEAR | CUSTOMER | CITY/ COUNTRY |
---|---|---|---|---|---|
- | 2X Servcie Water Storage Tanks | Turnkey- 2 X Service water Storage Tank- API 650 H= 18 m D= 12 m | 2016 | Gama | Boufarik-Algeria |
- | 2X Demin Water Storage Tanks | Turnkey- 2 X Demin water Storage Tank- API 650 H=30 m D= 17 m | 2016 | Gama | Boufarik-Algeria |
- | 2X Fire Water Storage Tanks | Turnkey- 2 X Fire water Storage Tank- API 650 H= 24 m D= 16 m | 2016 | Gama | Boufarik-Algeria |
- | 2X Diesel Fuel Water Storage Tanks | Turnkey- 2 X Diesel Fuel Storage Tank- API 650 H= 35 m D= 17 m | 2016 | Gama | Boufarik-Algeria |
- | 9 X Sulphuric Acid Tank | Turnkey- 9 X Sulphuric Acid Storage Tank | 2015 | Ronesans | Turkmenistan |
- | 1 X Demin Water Storage Tank | Turnkey- 1 X demin water Storage Tank- API 650 H=12 m D=7.5 m | 2013 | CALIK Enerji | Lebab-Turkmenistan |
- | 1 X Demin Water Storage Tank | Turnkey- 1 X demin water Storage Tank- API 650 H=12 m D=7.5 m | 2013 | CALIK Enerji | Ahal- Turkmenistan |
- | 1 X Demin Water Storage Tank | Turnkey- 1 X demin water Storage Tank- API 650 H=12 m D=7.5 m | 2013 | CALIK Enerji | Turkmenistan |
- | 2 X Fuel Oil Storage Tanks | Engineering-Procurement-Pre Fabrication H= 25 m D= 12 m | 2006 | JSC Power Machines | Kerkuk-Iraq |
POWER PLANT CAPACITY | PROJECT DESCRIPTION | JOB DESCRIPTION | YEAR | CUSTOMER | CITY/ COUNTRY |
---|---|---|---|---|---|
Wind Tunnel | TEI-Subsonic Wind Tunnel Project | 500 Ton Mechanical Erection Works | 2022-On Going | HOWDEN | TURKEY |
704 MW | Engineering, Procurement, Manufacturing, Erection and Commissioning | 2 x 5.600m3 Fire Water Tanks | 2016 | GAMA POWER SYSTEMS | ALGERIA |
704 MW | Engineering, Procurement, Manufacturing, Erection and Commissioning | 2 x 2.500m3 Service Water Tanks | 2016 | GAMA POWER SYSTEMS | ALGERIA |
704 MW | Engineering, Procurement, Manufacturing, Erection and Commissioning | 2 x 11.000m3 Demin Water Tanks | 2016 | GAMA POWER SYSTEMS | ALGERIA |
704 MW | Engineering, Procurement, Manufacturing, Erection and Commissioning | 2 x 14.500m3 Fuel Oil Water Tanks | 2016 | GAMA POWER SYSTEMS | ALGERIA |
9 Field Erected tanks for Sulphuric Acid Plant | Construction of 9 Field Erected tanks for Sulphuric Acid Plant. 4x2,913m3 Product Storage Tanks, 1x1,767m3 Unfiltered Sulphur Storage Tank, 1x1,767m3 Filtered Storage Tank, 1x206m3 Sulphur Melter, 1x 142,5m3 DMW Holding Tank, 1x233m3 DMW Condensate | 2016 | Ronesans Heavy Industries | TURKMENISTAN | |
704 MW | Engineering, Procurement, Manufacturing, Erection and Commissioning | 3xGE Frame 9FA Gas Turbine Exhaust Systems including, silencer, diffuser, expansion joints | 2015 | GAMA POWER SYSTEMS | ALGERIA |
2x70MW | Engineering, Procurement, Erection and Commissioning | 2x GE PG6101FA Gas Turbine Exhaust system. Each 25mt Height and 3mt diameter with expansion joint, diffuser and diverter | 2015 | TURKEY | |
149,2MW | Electro-Mechanical Erection & Commissioning | 3xGE LM6000 Gas Turbine and Electro Mechanical Erection works | 2014 | CALIK ENERJI | TURKMENISTAN |
146,7MW, 141,7MW,149,2 | Fabrication, Erection and Testing | 3x600m3 Demineralised Water Tanks | 2014 | CALIK ENERJI | TURKMENISTAN |
770MW | Partial Engineering, Procurement, Erection | Gas Turbine Inlet Air Cooling System for GE Frame 9FA partly Engineering, Procurement and Erection works of Civil, Mechanical, Electrical and I&C, including Commissioning | 2012 | BAYMiNA | TURKEY |
1x60MW | Suplly & Replacement | Replacement of 1 pc. Expansion Joint Between GE LM6000 & Existing Heat Recovery Steam Generator | 2011 | BiSEN | TURKEY |
2x250MW | Engineering, Procurement, Erection and Commissioning | 4x GE 9E Gas Turbine Exhaust system. Each 25mt Height and 6mt diameter with expansion joints and diffuser | 2010 | TURKMENISTAN | |
Supply & Replacement | Natural Gas Conversion Project for Tire Paper Factory | 2006 | BiSEN | TURKEY | |
150MW | Procurement, Erection | 3XGE LM 6000 Gas Turbine Heat Recovery Steam Generator Procurement, Erection and Commissioning | 2004 | TURKEY | |
75 MW | HRSG Modificiation | 2 X HRSG Modification, addition of HP Pressure sections and Drums | 2004 | TURKEY |
POWER PLANT CAPACITY | PROJECT DESCRIPTION | JOB DESCRIPTION | YEAR | CUSTOMER | CITY/ COUNTRY |
---|---|---|---|---|---|
Al Rusafa Water Treatment | Cleat Agent(FM200) Automatic Fire Extinguishing System | Basic Engineerg-Supply and Export | 2014 | Baghdad / IRAQ | |
Al Rusafa Water Treatment | Kiosk Substation with Switchgear rooms and Transformers | Basic Engineerg-Supply and Export | 2013 | Baghdad / IRAQ | |
Buzurgan Power Plant | Water Spray Type and Foam Type Fire Fighting System and Fire Pumps | Basic Engineerg-Supply and Export | 2012 | Al Billal Company | Buzurghan / IRAQ |
Baghdad R3 & R5 Water Pu | 1000 kVA and 3200 kVA Transformers with expansion tanks | Basic Engineerg-Supply and Export | 2012 | Al Mabrook | Baghdad / IRAQ |
Al Rusafa Water Treatment | 230pcs. Sand Louvers with Filters | Basic Engineerg-Supply and Export | 2012 | Al Mabrook | Baghdad / IRAQ |
Al Rusafa Water Treatment | Disconnecting Switches | Basic Engineerg-Supply and Export | 2012 | Baghdad / IRAQ | |
Al Rusafa Water Treatment | Water Pumps, Submersible Pumps, Oil Pumps and Fire Fighting Pumps | Basic Engineerg-Supply and Export | 2012 | Baghdad / IRAQ | |
2x42MW Kashagan Develpr | 1x3000kW Auxiliary Boiler | Basic Engineerg-Supply and Export | 2011 | GAMA-TEKFEN | Atyrau / KAZAKHSTAN |
2x42MW Kashagan Develpr | 2x1750kW Auxiliary Boiler | Basic Engineerg-Supply and Export | 2011 | GAMA-TEKFEN | Atyrau / KAZAKHSTAN |
Baghdad R3 Water Station | Neutral Grounding Resistors | Basic Engineerg-Supply and Export | 2011 | Al Mabrook | Baghdad / IRAQ |
Baghdad R3 Water Station | 3x1500kVA Diesel Generator Sets with Syncronization Panels and Spare Parts | Basic Engineerg-Supply and Export | 2011 | Al Mabrook | Baghdad / IRAQ |
Baghdad R3 Water Station | Air Fans with Filters for Generator Room , Pump Room, Transformer Room, Guard | Basic Engineerg-Supply and Export | 2010 | Al Mabrook | Baghdad / IRAQ |
Baghdad R3 Water Station | 6x SDN 400/600B, 450kW+2 SDN 400/600, 375kW Main Pumps | Basic Engineerg-Supply and Export | 2010 | Al Mabrook | Baghdad / IRAQ |
2x42MW Kashagan Develpm | 1x20Tons & 1xa2Tons Overhead Crane for Maintenance | Basic Engineerg-Supply and Export | 2010 | GAMA-TEKFEN | Atyrau / KAZAKHSTAN |
Baghdad R3 Water Station | Workshop Equipments with all neccessary Lathe Machines, Milling Machines and Hand Tools | Basic Engineerg-Supply and Export | 2010 | Al Mabrook | Baghdad / IRAQ |
Baghdad R3 Water Station | 1400 and 1600 DN Flow Meters | Basic Engineerg-Supply and Export | 2010 | Al Mabrook | Baghdad / IRAQ |
Baghdad R3 Water Station | 1000m3 Water Tank | Basic Engineerg-Supply and Export | 2010 | Al Mabrook | Baghdad / IRAQ |
Baghdad R3 Water Station | 3,3 kW and 11kW Switch Gear and Spare Parts | Basic Engineerg-Supply and Export | 2010 | Al Mabrook | Baghdad / IRAQ |
Baghdad R5 Water Station | 3,3 kW Switch Gear | Basic Engineerg-Supply and Export | 2010 | Al Mabrook | Baghdad / IRAQ |
Baghdad Water Station | Varius Pumps and Tanks | Basic Engineerg-Supply and Export | 2009 | Al Mabrook | Baghdad / IRAQ |
Baghdad Water Station | Different size gear and handy pumps | Basic Engineerg-Supply and Export | 2009 | Al Mabrook | Baghdad / IRAQ |
Baghdad Water Station | 1400 and 1600 DN Flow Meters | Basic Engineerg-Supply and Export | 2009 | Al Mabrook | Baghdad / IRAQ |
Baghdad Water Pumps Stat | 3.3KV Switch Gear | Basic Engineerg-Supply and Export | 2008 | Al Mabrook | Baghdad / IRAQ |
Baghdad Water Pumps Stat | 11KV Switch Gear | Basic Engineerg-Supply and Export | 2007 | Al Mabrook | Baghdad / IRAQ |
Dibis Power Plant 2x150MW | Overhead Cranes | Basic Engineerg-Supply and Export | 2006 | Power Machines | Kerkuq / IRAQ |
Dibis Power Plant 2x150MW | 3x Diesel Oil Tanks(25m I.D) | Basic Engineerg-Supply and Export | 2006 | Power Machines | Kerkuq / IRAQ |
Dibis Power Plant 2x150MW | 2x Compressed Air System | Basic Engineerg-Supply and Export | 2006 | Power Machines | Kerkuq / IRAQ |
Dibis Power Plant 2x150MW | 2x1250kVA Diesel Generator | Basic Engineerg-Supply and Export | 2006 | Power Machines | Kerkuq / IRAQ |
Dibis Power Plant 2x150MW | Medium Voltage Switch Gear | Basic Engineerg-Supply and Export | 2006 | Power Machines | Kerkuq / IRAQ |