 CAPACITY PROJECT DESCRIPTION JOB DESCRIPTION YEAR CUSTOMER CITY/ COUNTRY
3 X 144 MW SCPP 3 X GT Exhaust By pass Stack behind Mitsubishi M701D Engineering-Manufacturing / 25 m height/ Di =6,100mm 2020 Ronesans HI Turkmenistan
6 X 10 MW SCPP-Diesel Engine 6 X 10 MW SCPP-Diesel Engine-MAN Engineering-Manufacturing / 30 m height/ Di =1,600mm 2019 Iltekno Gine
3 X 26 MW CCPP 3 X GT Exhaust By pass Stack behind GE-Frame 5 Engineering-Manufacturing / 30 m height/ Di =2,400mm + Diverter 2016 Sadelmi-Qapco Doha-Qatar
2 X 70 MW CCPP 2 X GT Exhaust By pass Stack behind GE-Frame 7 FA Engineering-Manufacturing and Erection / 25 m height/ Di =4,200mm 2015 EVER-Taha Mardin-Turkey
3 X 250 MW SCPP 3 X GT Exhaust By pass Stack behind GE-Frame 9FA Engineering-Manufacturing and Erection / 35 m height/ Di =7,000mm 2015 Gama Boufarik-Algeria
1X 285 MW SCPP 1 X GT Exhaust By pass Stack behind Siemens SGT 5-4000F Engineering-Manufacturing / 35 m height/ Di =6,800mm 2013 MiTEK Basra-Iraq
1 X 60 MW CCPP 1 X GT Exhaust By pass Stack behind GE-LM6000 Engineering-Manufacturing and Erection / 24 m height/ Di =3,400mm + Diverter 2012 BiSEN Bursa-Turkey
2 X 42 MW SCPP 2 X GT Exhaust By pass Stack behind GE-Frame6 B Engineering-Manufacturing and Erection / 40 m height/ Di =3,500mm 2011 Gama-Tekfen Atyrau-Kazakistan
2 X 45 MW CCPP 2 X GT Exhaust By pass Stack behindGE-LM6000 Engineering-Manufacturing / 25 m height/ Di =3,400mm + Diverter 2010 IEG Botswana
1 X 60 MW CCPP 1 X GT Exhaust By pass Stack behindGE-LM6000 Engineering-Manufacturing / 30 m height/ Di =3,000mm + Diverter 2010 IEG Povaska- Slovakia
1 X 60 MWCCPP 1 X GT Exhaust By pass Stack behind Siemens SGT 800 Engineering-Manufactuing / 21 m height/ Di =3,600mm + Diverter 2009 Raumag Brauschwieg-Germany
2 X 285 MW SCPP 2 X GT Exhaust By pass Stack behind Siemens SGT 5-4000F Engineering-Manufacturing / 40 m height/ Di =7,000mm 2009 ENKA Zwitina-Libya
2 X 127 MW SCPP 2 X GT Exhaust By pass Stack behind GE- Frame 9 E Engineering-Manufacturing and Erection / 25 m height/ Di =6,500mm 2009 LOTUS Awaza-Turkmenistan
2 X 127 MW SCPP 2 X GT Exhaust By pass Stack behind GE- Frame 9 E Engineering-Manufacturing and Erection / 25 m height/ Di =6,500mm 2009 LOTUS Ahal-Turkmenistan
1 X 60 MW CCPP 1 X GT Exhaust By pass Stack behindGE-LM6000 Engineering-Manufacturing / 40 m height/ Di =3,000mm + Diverter 2009 IEG Dante-Slovakia
1 X 50 MW CCPP 1 X GT Exhaust By pass Stack behind GE-LM6000 Engineering-Manufacturing / 30 m height/ Di =3,000mm + Diverter 2008 Nooter Eriksen Hereke-Tukey
1 X 60 MW CCPP 1 X GT Exhaust By pass Stack behind GE-LM6000 Engineering-Manufacturing / 25 m height/ Di =3,200mm + Diverter 2008 ZORLU Luleburgaz-Turkey
4 X 50 MW CCPP 4 X GT Exhaust By pass Stack behind GE-LM6000 Engineering-Manufacturing / 30 m height/ Di =3,000mm + Diverter 2007 IEG Karachi-Pakistan
2 X 150 MW SCPP 2 X GT Exhaust By pass Stack behind Siemens V94.2 Engineering-Manufacturing / 35 m height/ Di =6,000mm 2006 OJSC Power Machines Kerkuk-Iraq
3 X HRSG Main Stack 3 X HRSG Main Stack Engineering-Manufacturing 2005 SASA Adana-Turkey
4X 60 MW CCPP 4 X GT Exhaust By pass Stack behind GE-LM6000 Engineering-Manufacturing and Erection / 24 m height/ Di =3,400mm + Diverter 2005 BiSEN Bursa-Turkey
3X 50 MW CCPP 3 X GT Exhaust By pass Stack behind GE-LM6000 Engineering-Manufacturing and Erection / 30 m height/ Di =3,000mm + Diverter 2004 ZORLU Kayseri-TURKEY
1 X 60 MW CCPP 1 X GT Exhaust By pass Stack behind GE-LM6000 Engineering-Manufacturing and Erection / 30 m height/ Di =3,000mm + Diverter 2004 BiSEN Bursa-Turkey
1 x 35 MW CCPP 1 X GT Exhaust By pass Stack behind GE-LM2500 Engineering-Manufacturing and Erection / 25 m height/ Di =2,750mm + Diverter 2003 ENTEK iZMiT- TURKEY
1 x 35 MW CCPP 1 X GT Exhaust By pass Stack behind GE-LM2500 Engineering-Manufacturing and Erection / 25 m height/ Di =2,750mm + Diverter 2003 ENTEK BURSA- TURKEY
1 x 35 MW CCPP 1 X GT Exhaust By pass Stack behind GE-LM2500 Engineering-Manufacturing and Erection / 25 m height/ Di =2,750mm + Diverter 2003 AYEN Ankara- TURKEY
1 X 60 MW CCPP 1 X GT Exhaust By pass Stack behind GE-Frame 6B Engineering-Manufacturing 30 m height/ Di =3,750mm + Diverter 2003 TUPRAS iZMiT- TURKEY
PLANT CAPACITY PROJECT DESCRIPTION JOB DESCRIPTION YEAR CUSTOMER CITY/COUNTRY
  Owner's Engineering Gemlik Gubre New Urea and UAN(Urea Ammonium Nitrate solution )Project 2020-On Going Gemlik Gubre TURKEY
360MW Technical Due Diligence 253 MW Çolakoğlu Metalurji Dilovası CCPP 2021 Çolakoglu
Metalurji
KOCAELİ
240MW Engineering Cengiz Enerji CCPP Project 2020 Cengiz Enerji UZBEKISTAN
630MW Owner's Engineering Yatagan Coal Fired Power Plant Rehabilitation and Upgrading Project 2019-On Going Yatagan Termik  TURKEY
120MW Owner's Engineering Owner's Engineering services for Upgrading of existing 120 MW CCPP 2019 Entek TURKEY
660MW Owner's Engineering Kemerkoy Coal Fired Power Plant Rehabilitation and Upgrading Project 2017 YK Enerji TURKEY
440MW Owner's Engineering Yenikoy Coal Fired Power Plant Rehabilitation and Upgrading Project 2017 YK Enerji TURKEY
704MW Basic and Detailed Engineering 2 x 5.600m3 Fire Water Site Storage Tanks 2015 Gama Power Systems ALGERIA
704MW Basic and Detailed Engineering 2 x 2.500m3 Service Water Site Storage Tanks 2015 Gama Power Systems ALGERIA
704MW Basic and Detailed Engineering 2 x 11.000m3 Demin Water Site Storage Tanks 2015 Gama Power Systems ALGERIA
704129 Basic and Detailed Engineering 2 x 14.500m3 Fuel Oil Site Storage Tanks 2015 Gama Power Systems ALGERIA
2x660MW Proposal Engineering 2x660MW CFPP DeSoX addition proposal engineering for detail design and preparation of BOQs for mechanical, elektrical-I&C and civil works 2015 Gama Industry TURKEY
3x26MW Engineering Exhaust Gas System for 3 x GE MS5001P Gas Turbines including diffuser, diverter, silencer, expansion joints, stack and stuructural Steel 2015 Sadelmi QATAR
2x70MW Engineering Exhaust Gas System for 2 x GE PG6101FA Gas Turbines including diffuser, diverter, silencer, expansion joints, stack and stuructural Steel 2015 Ever Industry TURKEY
92,50MW Owner's Engineering Geothermal Power Plant. 1x47500kW Double Flash - 2x22500kW Binary Cycle 2014 GURİŞ TURKEY
146,7MW, 141,7MW, 149,2MW Basic and Detailed Engineering 3x600m3 Demineralised Water Tanks 2014   TURKMENISTAN
600MW Engineering Equipment Loads & Civil Foundation Calculations 2013 ENERJiSA TURKEY
2x135MW Engineering Coal Fired Power Plant Stack Engineering with ducts 2013 AKSA TURKEY
2x150MW Due Dilligence Coal Fired Power Plant 2013 ENERJiSA TURKEY
2000MW Technical Due Diligence Technical Due Diligence of the whole Energy Portfolio (over 2000 mw including combined cycle power plants, coal fired power plants and hydro power plants) of Turkey's biggest Energy Production company for EON with Lahmayer International. 2013 ENERJiSA TURKEY
600MW Pre-Feasibility Study Conceptual Design and Pre-Feasibility Study of 600MW CCPP 2012 ENERJiSA TURKEY
450MW Pre-Feasibility Study Conceptual Design and Pre-Feasibility Study of 450MW CCPP 2012 ERMET TURKEY
500MW Pre-Feasibility Study Conceptual Design and Pre-Feasibility Study of 500MW CCPP 2012 LiMAK TURKEY
670MW Due Dilligence Due Dilligence of 670MW CCPP 2012 ENERJiSA TURKEY
820 MW HRSG Commissioing 2 X Benson HRSG behind 2 X SGT5- 4000F GT Commissioing works 2012 PROKON TURKEY
779MW Gas Turbine Inlet Air Cooling Structural Design of Chiller Building, Supporting Structural design review of Cooling Coils 2012 BAYMiNA TURKEY
440MW Owner's Engineering Preparation of EPC Tenders for 440MW CCPP 2010 GURi§ TURKEY
  Engineering 3 X Industrial Boilers 2005 SASA TURKEY
75MW Consulting Pressure Parts Manufacturing 2005   TURKEY
75MW Engineering & Consulting Consulting for HRSG Rehabilitation, Modification and Upgrading 2004 GAMA TURKEY
35 MW Engineering & Consulting Heat Recovery Steam Generator/ Exhaust Gas System/ Water Steam External piping: LM2500 Gas Turbine 2003 GAMA TURKEY
25 MW Engineering Exhaust Gas System for GE LM2500 Gas Turbine 2003 GAMA TURKEY
75 MW Consulting Technical Evaluation of bids for retrofit work 2003 TUPRAŞ TURKEY
60MW Consulting Heat Recovery Steam Generator for 1xGE FRAME 6B Gas Turbine 2003 TUPRAŞ TURKEY
150 MW Engineering Combined cycle Power Plant Consisting of 13 XWartsila Diesel Engines, 4 X Heat Recovery Steam Generator and 1 X Steam Turbine generator 2002 GAMA TURKEY
POWER PLANT CAPACITY PROJECT DESCRIPTION JOB DESCRIPTION YEAR CUSTOMER CITY/ COUNTRY
- 2X Servcie Water Storage Tanks Turnkey- 2 X Service water Storage Tank- API 650 H= 18 m D= 12 m 2016 Gama  Boufarik-Algeria
- 2X Demin Water Storage Tanks Turnkey- 2 X Demin water Storage Tank- API 650 H=30 m D= 17 m 2016 Gama Boufarik-Algeria
- 2X Fire Water Storage Tanks Turnkey- 2 X Fire water Storage Tank- API 650 H= 24 m D= 16 m 2016 Gama Boufarik-Algeria
- 2X Diesel Fuel Water Storage Tanks Turnkey- 2 X Diesel Fuel Storage Tank- API 650 H= 35 m D= 17 m 2016 Gama Boufarik-Algeria
- 9 X Sulphuric Acid Tank Turnkey- 9 X Sulphuric Acid Storage Tank 2015 Ronesans  Turkmenistan
- 1 X Demin Water Storage Tank Turnkey- 1 X demin water Storage Tank- API 650 H=12 m D=7.5 m 2013 CALIK Enerji Lebab-Turkmenistan
- 1 X Demin Water Storage Tank Turnkey- 1 X demin water Storage Tank- API 650 H=12 m D=7.5 m 2013 CALIK Enerji Ahal- Turkmenistan
- 1 X Demin Water Storage Tank Turnkey- 1 X demin water Storage Tank- API 650 H=12 m D=7.5 m 2013 CALIK Enerji Turkmenistan
- 2 X Fuel Oil Storage Tanks Engineering-Procurement-Pre Fabrication H= 25 m D= 12 m 2006 JSC Power Machines Kerkuk-Iraq
POWER PLANT CAPACITY PROJECT DESCRIPTION JOB DESCRIPTION YEAR CUSTOMER CITY/ COUNTRY
Wind Tunnel TEI-Subsonic Wind Tunnel Project 500 Ton Mechanical Erection Works 2022-On Going HOWDEN TURKEY
704 MW Engineering, Procurement, Manufacturing, Erection and Commissioning 2 x 5.600m3 Fire Water Tanks 2016 GAMA POWER SYSTEMS ALGERIA
704 MW Engineering, Procurement, Manufacturing, Erection and Commissioning 2 x 2.500m3 Service Water Tanks 2016 GAMA POWER SYSTEMS ALGERIA
704 MW Engineering, Procurement, Manufacturing, Erection and Commissioning 2 x 11.000m3 Demin Water Tanks 2016 GAMA POWER SYSTEMS ALGERIA
704 MW Engineering, Procurement, Manufacturing, Erection and Commissioning 2 x 14.500m3 Fuel Oil Water Tanks 2016 GAMA POWER SYSTEMS ALGERIA
  9 Field Erected tanks for Sulphuric Acid Plant Construction of 9 Field Erected tanks for Sulphuric Acid Plant. 4x2,913m3 Product Storage Tanks, 1x1,767m3 Unfiltered Sulphur Storage Tank, 1x1,767m3 Filtered Storage Tank, 1x206m3 Sulphur Melter, 1x 142,5m3 DMW Holding Tank, 1x233m3 DMW Condensate 2016 Ronesans Heavy Industries TURKMENISTAN
704 MW Engineering, Procurement, Manufacturing, Erection and Commissioning 3xGE Frame 9FA Gas Turbine Exhaust Systems including, silencer, diffuser, expansion joints 2015 GAMA POWER SYSTEMS ALGERIA
2x70MW Engineering, Procurement, Erection and Commissioning 2x GE PG6101FA Gas Turbine Exhaust system. Each 25mt Height and 3mt diameter with expansion joint, diffuser and diverter 2015   TURKEY
149,2MW Electro-Mechanical Erection & Commissioning 3xGE LM6000 Gas Turbine and Electro Mechanical Erection works 2014 CALIK ENERJI TURKMENISTAN
146,7MW, 141,7MW,149,2 Fabrication, Erection and Testing 3x600m3 Demineralised Water Tanks 2014 CALIK ENERJI TURKMENISTAN
770MW Partial Engineering, Procurement, Erection Gas Turbine Inlet Air Cooling System for GE Frame 9FA partly Engineering, Procurement and Erection works of Civil, Mechanical, Electrical and I&C, including Commissioning 2012 BAYMiNA TURKEY
1x60MW Suplly & Replacement Replacement of 1 pc. Expansion Joint Between GE LM6000 & Existing Heat Recovery Steam Generator 2011 BiSEN TURKEY
2x250MW Engineering, Procurement, Erection and Commissioning 4x GE 9E Gas Turbine Exhaust system. Each 25mt Height and 6mt diameter with expansion joints and diffuser 2010   TURKMENISTAN
  Supply & Replacement Natural Gas Conversion Project for Tire Paper Factory 2006 BiSEN TURKEY
150MW Procurement, Erection 3XGE LM 6000 Gas Turbine Heat Recovery Steam Generator Procurement, Erection and Commissioning 2004   TURKEY
75 MW HRSG Modificiation 2 X HRSG Modification, addition of HP Pressure sections and Drums 2004   TURKEY
POWER PLANT CAPACITY PROJECT DESCRIPTION JOB DESCRIPTION YEAR CUSTOMER CITY/ COUNTRY
Al Rusafa Water Treatment Cleat Agent(FM200) Automatic Fire Extinguishing System Basic Engineerg-Supply and Export 2014   Baghdad / IRAQ
Al Rusafa Water Treatment Kiosk Substation with Switchgear rooms and Transformers Basic Engineerg-Supply and Export 2013   Baghdad / IRAQ
Buzurgan Power Plant Water Spray Type and Foam Type Fire Fighting System and Fire Pumps Basic Engineerg-Supply and Export 2012 Al Billal Company Buzurghan / IRAQ
Baghdad R3 & R5 Water Pu 1000 kVA and 3200 kVA Transformers with expansion tanks Basic Engineerg-Supply and Export 2012 Al Mabrook Baghdad / IRAQ
Al Rusafa Water Treatment 230pcs. Sand Louvers with Filters Basic Engineerg-Supply and Export 2012 Al Mabrook Baghdad / IRAQ
Al Rusafa Water Treatment Disconnecting Switches Basic Engineerg-Supply and Export 2012   Baghdad / IRAQ
Al Rusafa Water Treatment Water Pumps, Submersible Pumps, Oil Pumps and Fire Fighting Pumps Basic Engineerg-Supply and Export 2012   Baghdad / IRAQ
2x42MW Kashagan Develpr 1x3000kW Auxiliary Boiler Basic Engineerg-Supply and Export 2011 GAMA-TEKFEN Atyrau / KAZAKHSTAN
2x42MW Kashagan Develpr 2x1750kW Auxiliary Boiler Basic Engineerg-Supply and Export 2011 GAMA-TEKFEN Atyrau / KAZAKHSTAN
Baghdad R3 Water Station Neutral Grounding Resistors Basic Engineerg-Supply and Export 2011 Al Mabrook Baghdad / IRAQ
Baghdad R3 Water Station 3x1500kVA Diesel Generator Sets with Syncronization Panels and Spare Parts Basic Engineerg-Supply and Export 2011 Al Mabrook Baghdad / IRAQ
Baghdad R3 Water Station Air Fans with Filters for Generator Room , Pump Room, Transformer Room, Guard Basic Engineerg-Supply and Export 2010 Al Mabrook Baghdad / IRAQ
Baghdad R3 Water Station 6x SDN 400/600B, 450kW+2 SDN 400/600, 375kW Main Pumps Basic Engineerg-Supply and Export 2010 Al Mabrook Baghdad / IRAQ
2x42MW Kashagan Develpm 1x20Tons & 1xa2Tons Overhead Crane for Maintenance Basic Engineerg-Supply and Export 2010 GAMA-TEKFEN Atyrau / KAZAKHSTAN
Baghdad R3 Water Station Workshop Equipments with all neccessary Lathe Machines, Milling Machines and Hand Tools Basic Engineerg-Supply and Export 2010 Al Mabrook Baghdad / IRAQ
Baghdad R3 Water Station 1400 and 1600 DN Flow Meters Basic Engineerg-Supply and Export 2010 Al Mabrook Baghdad / IRAQ
Baghdad R3 Water Station 1000m3 Water Tank Basic Engineerg-Supply and Export 2010 Al Mabrook Baghdad / IRAQ
Baghdad R3 Water Station 3,3 kW and 11kW Switch Gear and Spare Parts Basic Engineerg-Supply and Export 2010 Al Mabrook Baghdad / IRAQ
Baghdad R5 Water Station 3,3 kW Switch Gear Basic Engineerg-Supply and Export 2010 Al Mabrook Baghdad / IRAQ
Baghdad Water Station Varius Pumps and Tanks Basic Engineerg-Supply and Export 2009 Al Mabrook Baghdad / IRAQ
Baghdad Water Station Different size gear and handy pumps Basic Engineerg-Supply and Export 2009 Al Mabrook Baghdad / IRAQ
Baghdad Water Station 1400 and 1600 DN Flow Meters Basic Engineerg-Supply and Export 2009 Al Mabrook Baghdad / IRAQ
Baghdad Water Pumps Stat 3.3KV Switch Gear Basic Engineerg-Supply and Export 2008 Al Mabrook Baghdad / IRAQ
Baghdad Water Pumps Stat 11KV Switch Gear Basic Engineerg-Supply and Export 2007 Al Mabrook Baghdad / IRAQ
Dibis Power Plant 2x150MW Overhead Cranes Basic Engineerg-Supply and Export 2006 Power Machines Kerkuq / IRAQ
Dibis Power Plant 2x150MW 3x Diesel Oil Tanks(25m I.D) Basic Engineerg-Supply and Export 2006 Power Machines Kerkuq / IRAQ
Dibis Power Plant 2x150MW 2x Compressed Air System Basic Engineerg-Supply and Export 2006 Power Machines Kerkuq / IRAQ
Dibis Power Plant 2x150MW 2x1250kVA Diesel Generator Basic Engineerg-Supply and Export 2006 Power Machines Kerkuq / IRAQ
Dibis Power Plant 2x150MW Medium Voltage Switch Gear Basic Engineerg-Supply and Export 2006 Power Machines Kerkuq / IRAQ